Seremban R&R Set To House Terra ChargEV – Nation’s First Integrated Charging Hub
-full_normal.jpg)
PLUS Malaysia Berhad (PLUS), in partnership with Yinson GreenTech (YGT), officially broken ground on Malaysia’s first Integrated Electric Vehicle (EV) Charging Hub at the Seremban R&R (Southbound) along the North–South Expressway (NSE).
The initiative marks a major step towards modernising the country’s highway network in line with the National Energy Transition Roadmap (NETR) and the Low Carbon Mobility Blueprint (LCMB). The project is jointly coordinated by the Works Ministry (KKR) under the supervision of the Malaysian Highway Authority (LLM).
-full_normal.jpg)
Expected to be completed by early 2027, the Seremban EV Hub will feature 20 DC fast charging points. It will also include eight duplex retail and F&B outlets, a drive-thru facility, 30 non-EV parking slots, public restrooms, and a surau, all for travellers’ convenience.
Designed with solar-ready infrastructure and energy-efficient lighting, the hub exemplifies Malaysia’s commitment to renewable energy and low-carbon mobility. Works Minister Datuk Seri Alexander Nanta Linggi said the project reflects the country’s effort to transform rest areas into smart, inclusive mobility destinations that also generate local economic growth.
-full_normal.jpg)
-full_normal.jpg)
-full_normal.jpg)
There are currently 140 fast charging points along Malaysian highways, including 114 within the PLUS network, a figure that will rise by another 50 points next year. PLUS aims to expand this further to 350 charging points nationwide by 2028, aligning with its goal of reducing greenhouse gas emissions by 35% by 2030 and achieving net zero by 2050.
During the ceremony, PLUS and YGT also announced the formation of Terra ChargEV Sdn. Bhd., a joint venture to develop and manage future hubs along the expressway network.
-full_normal.jpg)
-full_normal.jpg)
PLUS Managing Director Datuk Nik Airina Nik Jaffar said the Seremban EV Hub represents PLUS’s long-term vision to enhance user experience through innovation and sustainability. “This project combines efficient fast charging with diverse F&B options, shaping a new standard for rest area facilities,” she said.
YGT CEO Lim Chern Yuan added that the hub will address key EV user concerns: convenience, speed, and reliability while encouraging greater adoption of electric vehicles nationwide.
-full_normal.jpg)
-full_normal.jpg)
PLUS Chairman Datuk Mohamad Nasir Ab. Latif said the Seremban site, already recognised as Malaysia’s first sustainable R&R, will serve as a benchmark for future highway developments. “Together with government partners, this project is a model for how innovation and public–private collaboration can drive the nation’s sustainable mobility future,” he said.
Gallery
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VRS2271
SELANGOR
BSU1401
JOHOR
JF384J
PULAU PINANG
PSF9490
PERAK
APL8039
PAHANG
CFH8716
KEDAH
KGJ3035
NEGERI SEMBILAN
NEM1410
KOTA KINABALU
SJU3520
KUCHING
QAB6589P
Last updated 30 Sep, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Related News
PLUS Unveils Five-Year Roadmap - AI, Clean Mobility and Climate Resilience
PLUS’s five-year plan embeds AI, climate resilience and large-scale EV charging to future-proof Malaysia’s main expressway.
18-11-2025
PLUS Surpasses 2025 Target with 112 EV Chargers
PLUS has rolled out 112 EV charging points across its highways, surpassing its 2025 target months ahead of schedule.
18-08-2025
PLUS Activates Contra Lane On Elite Until Nov 27
A nightly contra lane will run between Bandar Saujana Putra and Putrajaya with lane diversions in place.
25-11-2025
PLUS To Close Two Bangi Ramps Nightly Until Nov 28
PLUS will close two ramps near Bangi nightly from 10PM to 5AM starting today until Nov 28.
10-11-2025
RM3b Juru–Sungai Dua Link Cuts Travel Time To Just 20 Minutes
RM3 billion traffic dispersal project aims to slash travel time between Juru and Sungai Dua from an hour to just 20 minutes.
10-11-2025
Work Begins On Juru–Sungai Dua Traffic Dispersal Project To Ease Penang Congestion
Work has officially kicked off on the long-awaited traffic dispersal project between the Juru and Sungai Dua toll plazas (PTJSD).
21-10-2025
Court Tells PLUS to Install Streetlights Along Dark Stretches of the NSE
The Court of Appeal has urged PLUS to install streetlights along dark stretches of the NSE after a fatal crash case.
25-09-2025
PLUS Announces Partial Lane Closures On NKVE, 10-11 Sept
Closures between Jalan Duta and Bukit Lanjan will take place from 11PM to 5AM for billboard gantry installation.
09-09-2025
Latest News
Kuching Gets Zeekr's First East Malaysia Store, With More Coming Next Year
Zeekr opens its first East Malaysia retail location at The Spring Kuching, with permanent sales and service centres targeted for Q1 2027.
29-09-2026
Buying A Hybrid Or EV? MAA Proposes Up To RM10,000 Tax Rebate
MAA proposes a RM7,000-RM10,000 income tax rebate for hybrid and EV buyers under Budget 2027, plus incentives for home charging and old-car scrapping.
28-09-2026
Driving Up North In An EV? There's A New 240 kW Charger At Rawang R&R
TNB Electron's new 240 kW DC EV charger at R&R Rawang Northbound is now live, with free charging available until 29 Sept 2026.
28-09-2026
Could An EV Really Work As A Malaysian Police Car? PDRM Is Finding Out
PDRM is testing the Proton e.MAS 5, e.MAS 7 EV and e.MAS 7 PHEV to see whether electrified vehicles could work for Malaysian police duties.
18-09-2026
Malaysia's Electricity Protection Is Now 800 kWh - How Much Power Does An EV Use Per 100 KM?
Malaysia's electricity protection threshold is now 800 kWh. Here's how much electricity popular EVs use per 100 km and what the extra 200 kWh means.
18-09-2026
17 New Mercedes Models Are Coming To Malaysia In 2027 - Here's What We Know
Mercedes-Benz Malaysia plans 17 new models for 2027, with most set for local assembly in Pekan. Here's what we know about its ICE and EV plans.
17-09-2026
Perodua QV-E Now At RM53,499 Vs Proton e.MAS 5: Which Makes More Sense?
Perodua QV-E now starts at RM53,499 with BaaS under its Malaysia Day promo. See how it compares with the Proton e.MAS 5 on price, range, charging and features.
16-09-2026
Yes, Tan Chong Is Involved In Perodua's EV. Here's What It's Actually Doing
Tan Chong has signed a three-year agreement to support Perodua's EV production with ED coating, painting and assembly-line services.
15-09-2026
Show More
trending_flat