KLIA Aerotrain To Undergo Overnight Works Starting Aug 18
.jpeg)
Travellers passing through KL International Airport (KLIA) at night may need to swap the Aerotrain for a bus ride over the next two weeks.
Malaysia Airports announced that scheduled maintenance will run from Aug 18, with work taking place between midnight and 5am to avoid peak travel hours.
During that window, the Aerotrain service, which shuttles passengers between the Main Terminal and the Satellite Building will be paused.

Airside shuttle buses will take over, and passengers are urged to follow signs or seek help from on-ground staff.
“These works are part of our ongoing effort to keep the Aerotrain running at its best
We’ve been monitoring real-time data since the service began, and these adjustments will help improve responsiveness, safety and long-term reliability,” said Malaysia Airports managing director Datuk Mohd Izani Ghani.
Among the upgrades is a new Automatic Vehicle Wash Plant (AVWP), a first for KLIA’s Aerotrain, replacing the previous manual cleaning process. The move is expected to improve maintenance efficiency and extend the lifespan of the train’s components.

Mohd Izani said the improvements were part of a broader plan to ensure KLIA remains a reliable and passenger-friendly hub.
“We’re committed to keeping journeys smooth and stress-free for travellers,” he added.
Since its launch, the Aerotrain has clocked more than 1,100 service hours, completed over 18,800 trips and carried more than two million passengers.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VSA4819
SELANGOR
BSV2920
JOHOR
JH7613J
PULAU PINANG
PSH5424
PERAK
APN2134
PAHANG
CFJ4636
KEDAH
KGJ9130
NEGERI SEMBILAN
NEM6571
KOTA KINABALU
SJV2938
KUCHING
QAB704Q
Last updated 23 Nov, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Related News
KLIA Aerotrain Begins Trial Runs, Nightly Shutdown Remains
Malaysia Airports will start trial operations for the KLIA Aerotrain as part of a month-long plan to fix reliability issues.
17-12-2025
Expert Urges Full Reset For KLIA Aerotrain To Fix Recurring Issues
KLIA’s aerotrain needs a system reset to ensure long-term reliability as patch fixes alone won’t solve recurring disruptions.
17-11-2025
KLIA Aerotrain Halts Daily Midnight To 5am For Maintenance
KLIA Aerotrain will stop running every night from midnight to 5am for routine checks and maintenance.
10-11-2025
KLIA Aerotrain Breaks Down Again; MOT, APAD Step In
KLIA’s Aerotrain is down again and the Transport Minister has told APAD to step in and probe MAHB’s handling of the issue.
28-10-2025
KLIA Aerotrain Under Review After Recent Service Disruption
Malaysia Airports and the Transport Ministry are reviewing recurring Aerotrain glitches at KLIA.
22-10-2025
MAHB Calls In Independent Assessor After Latest KLIA Aerotrain Glitch
MAHB will appoint an independent assessor to review the KLIA aerotrain’s power system after another breakdown on Wed.
21-10-2025
MOT May Take Action Against MAHB After Latest KLIA Aerotrain Glitch
MOT is weighing possible action against Malaysia Airports Holdings Bhd (MAHB) following a string of aerotrain disruptions.
16-10-2025
Another Breakdown At KLIA: How Many More Times Must the Aerotrain Fail?
Both Aerotrains at KLIA Terminal 1 came to an abrupt halt around 8.30PM on Wed after a sudden power trip.
16-10-2025
Latest News
Women Want Female E-Hailing Drivers. But Are There Enough Options In Malaysia?
Looking for female e-hailing drivers in Malaysia? Explore women-only rides, service availability, passenger safety and legal transport requirements.
18-11-2026
Malaysia Toll Abolition Explained: RM400 Billion And Highway Concessions
Why could abolishing Malaysia's highway tolls cost RM400 billion? Explore highway concessions, toll payments and alternatives to nationwide toll abolition.
17-11-2026
GWM Malaysia 2026 Year-End Deals: Prices, Warranties And Financing Offers
GWM Malaysia's 2026 year-end deals include the ORA Good Cat from RM94,000, Haval H6 HEV privileges, WEY G9 financing and Tank SUV warranties.
16-11-2026
Honda Sumber Auto Edaran PJ Closes After 25 Years Of Operations
Honda Sumber Auto Edaran PJ has closed after 25 years, with over 27,000 cars sold. Here's what existing Honda customers should know.
16-11-2026
All-New Nissan X-Trail e-POWER x e-4ORCE Makes First Public Appearance In Malaysia
The new Nissan X-Trail e-POWER x e-4ORCE makes its first public road appearance in KL ahead of its Q4 2026 Malaysia launch. Here's what we know.
16-11-2026
Proton Sales 2026: Geely-Based Models Overtake Homegrown Cars
Geely-based Protons lead homegrown models in 2026 registrations. But the e.MAS lineup and Saga sales reveal a more interesting story.
13-11-2026
Johor Highway Upgrades: PLUS And Senai-Desaru May Open Early
Two Johor highway stretches on PLUS and Senai-Desaru may open early in 2027. Here's where they are, proposed dates and what drivers should know.
13-11-2026
Loke Says Some Welcomed His Resignation, Urges JPJ To Maintain Enforcement
Anthony Loke says some cheered his resignation, expecting JPJ's overloaded lorry crackdown to ease. Will enforcement continue without him?
12-11-2026
Show More
trending_flat
Malaysia First Used Car and EV Consignment Platform
This is the best place to sell your car at true market value. Instead of accepting low dealer trade-ins, we handle everything and connect your car directly to genuine buyers for the highest price.

Understanding CariCarzAutomall Consignment Plan


Approved 200-Check Points Inspection

7 Day Money Back Guarantee

One Year Extended Warranty

No Hidden Charge

