Govt Finalising Key Parameters For KL-SG HSR Project - MOT

The Ministry of Transport announced that the government is in the process of finalizing key parameters for the High-Speed Rail (HSR) Kuala Lumpur-Singapore (KL-SG) project.
The project, which will be spearheaded by the private sector, will be presented to the Cabinet for approval. The next phase will involve a Request for Proposal (RFP) process to evaluate shortlisted consortiums based on funding mechanisms, project model studies, and other relevant details, it says.
The ministry was responding to a question from Mersing MP Muhammad Islahuddin Abas at the Dewan Rakyat on February 17 about the present status of the HSR KL-SG project, following Malaysian Resources Corporation Bhd's withdrawal from the consortium managed by Berjaya Rail Sdn Bhd.

-full_normal.jpg)

It also shared that MyHSR Corporation Sdn Bhd has finished assessing seven conceptual proposals from local and international firms/consortia received through a Request for Information (RFI) process.
The Kuala Lumpur-Singapore high-speed rail (HSR) is a proposed railway project that would connect Kuala Lumpur and Singapore by a high-speed rail route. The 350-kilometer rail route, initially slated for completion in 2026, was intended to connect major stations in Kuala Lumpur, Putrajaya, Negeri Sembilan, Melaka, and Johor.
However, following a change in government in 2018, the project was scrutinised for its exorbitant expenses and financial implications. Work was suspended in September 2018, and the project was officially terminated in 2021 after both countries failed to reach an agreement on proposed adjustments.
-full_normal.jpg)
Malaysia was compelled to compensate Singapore with S$102.8 million (RM340.6 million) for incurred costs. Despite the losses, Prime Minister Datuk Seri Anwar Ibrahim has previously declared that the government is willing to review the HSR project provided prices are reduced.
Written By
Anis
Previously in banking and e commerce before she realized nothing makes her happier than a revving engine and gleaming tyres........
JPJ Running Numbers
KUALA LUMPUR
VRS2271
SELANGOR
BSU1401
JOHOR
JF384J
PULAU PINANG
PSF9490
PERAK
APL8039
PAHANG
CFH8716
KEDAH
KGJ3035
NEGERI SEMBILAN
NEM1410
KOTA KINABALU
SJU3520
KUCHING
QAB6589P
Last updated 30 Sep, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Related News
Govt Still Weighing Options For KL–Singapore HSR Project - Loke
Malaysia is still reviewing options for the KL–Singapore HSR, with a final model yet to be determined.
08-10-2025
Govt Still Weighing Options For KL–Singapore HSR Project - Loke
Malaysia is still reviewing options for the KL–Singapore HSR, with a final model yet to be determined.
08-10-2025
Govt Open To Reviving KL-SG HSR With Private Sector Involvement - PM Anwar
The government has decided that the KL-SG HSR project can be resurrected with full private sector participation.
08-01-2025
KL-SG HSR Project: MRCB Withdraws from MyHSR Corp
Berjaya led MyHSR consortium now better aligned with project target following MRCB’s exit.
19-12-2024
KL-SG HSR Project Will Cost 30% Less Than Projected RM110 Billion
The KL-SG HSR project will cost roughly RM70 billion, roughly 30% lesser than the initial projected RM110 Billion.
19-04-2024
HSR Project Receives 7 Concept Proposal, Govt Needs Two Months To Review
The Transport Ministry announced on parliament’s website that the HSR Project has received 7 Concept Proposals.
05-03-2024
Why Japanese Companies Not Interested On Malaysia's Bullet Train Project
Japanese companies are not keen on Malaysia’s HSR project due to worries about the Malaysian government's lack of funding.
26-01-2024
KL-Bangkok Line Possible - MyHSR Corp Head
According to MyHSR Corporation chairman Datuk Seri Fauzi, there is a chance that the bullet train will be extended to Malaysia's northern region.
08-01-2024
Latest News
Why Extending The ECRL To Rantau Panjang Could Be A Much Bigger Deal Than It Sounds
The proposed ECRL extension to Rantau Panjang could link Malaysia with Thailand and a wider Asian rail and port network. Here's why it matters.
29-09-2026
Malaysia's First Locally Built EV And PHEV Pick-Ups Are Coming From JAC
JAC will locally assemble its T9 EV and PHEV in Kulim, creating Malaysia's first CKD electrified pick-ups, with exports also being explored.
29-09-2026
Nearly Half A Million Summonses To Foreign Drivers: JPJ Says Some Employers Are Enabling It
JPJ issued 481,119 summonses to foreign drivers from 2024 to Sept 2026, while warning that some employers and vehicle owners are enabling illegal driving.
29-09-2026
Why Is Malaysia's Finance Ministry Testing A GWM WEY G9? Here's What We Know
Malaysia's Finance Ministry is evaluating a locally assembled GWM WEY G9 PHEV with SPANCO. Here's what the government fleet trial actually means.
25-09-2026
Several Riders Skidded At The Same 'Anti-Skid' Lane. Here's What JKR Says
Several riders skidded on an 'anti-skid' Federal Highway motorcycle lane. JKR is investigating the surface, contamination and other possible factors.
25-09-2026
Only RM10K Separates The Two CKD iCAUR 03s - Here's What You Get
Both iCAUR 03 variants are now CKD in Malaysia. With just RM10,140 between the RWD and iWD, here's what the extra money gets you.
25-09-2026
JPJ Letting Rohingya Apply For Driving Licences? Here's The Fact Check
A viral post claims JPJ is proposing to let Rohingya apply for driving licences in Malaysia. JPJ says the claim is false and has reported it to MCMC.
24-09-2026
Going To Singapore From Oct 6? Check Your VEP Or Risk Getting Turned Back
Driving to Singapore from Oct 6? Foreign vehicles will face VEP checks during SG Arrival Card submission. Here's what Malaysian drivers need to know.
24-09-2026
Show More
trending_flat
