Ahmad Maslan: Gov. Mulling Further Cost-Reduction For MRT3
-full_normal.jpg)
The Mass Transit Transit 3 (MRT3) project, which is set to complete the urban rail network in Kuala Lumpur, has not been finalised yet. Deputy Minister of Finance, Datuk Seri Ahmad Bin Maslan, confirmed this whilst summarising the Supplementary Supply Bill (2022) 2023 in Dewan Rakyat, earlier today.
The Deputy Minister said that although the government had announced during the last 2023 Budget that the cost for MRT 3 had been brought down to RM50.2 Billion from RM68 Billion, the ministry feels there is further room for more reduction. "There are proposals that the cost can be lowered down to RM45 Billion and that they are waiting for the proposal before making any firm decisions,” adds Ahmad Maslan further.
The MRT3 line spans a total of 50.8 KM in length, of which 40.1 KM would be elevated, whilst 10.7 KM would run underground. A total of 31 stations along this line are planned with 7 of which being underground. The initial launch date for MRT3 was set for 2028 for Phase 1, followed by 2030 for Phase 2.
-full_normal.jpg)
MRT3, which would run along the other circle of the city, is crucial to complete the entire network connectivity between MRT1 and MRT2. This line would encircle the greater Kuala Lumpur area by cutting through high density areas such as Setiawangsa, Titiwangsa, Mont Kiara, Pantai Dalam, and Pandan Indah.
Ahmad Maslan also said that the government will carry out a comprehensive study of the effectiveness of the MRT3 project compared to Bus Rapid Transit (BRT), taking into account the locations, traffic volume, and overall cost.
Gallery
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VSA4819
SELANGOR
BSV2920
JOHOR
JH7613J
PULAU PINANG
PSH5424
PERAK
APN2134
PAHANG
CFJ4636
KEDAH
KGJ9130
NEGERI SEMBILAN
NEM6571
KOTA KINABALU
SJV2938
KUCHING
QAB704Q
Last updated 23 Nov, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Related News
Public Review Opens for Revised Penang Mutiara LRT with Cross-Sea Link at Core
MRT Corp opens a three-month public review for the Penang Mutiara LRT, featuring a proposed six-kilometre cross-sea link to Penang Sentral.
23-02-2026
RTS Link to Deploy 100 E-Gates at Bukit Chagar ICQ
RTS Link to deploy 100 e-gates at Bukit Chagar ICQ as part of a high-capacity, congestion-reducing clearance system.
03-02-2026
MRT Corp Justifies RM16.8b Penang LRT Budget
MRT Corp says the RM16.8 billion ceiling for Penang LRT reflects market realities, but MCA wants clearer answers on taxpayers’ money.
21-08-2025
MRT3 Gets MOT Approval, Completion Set for 2026
The 51.6 KM MRT Circle Line is officially approved, full rollout expected by end of 2026.
18-07-2025
Penang Still Waiting For Green Light From MOT For LRT project
Penang is set to begin Mutiara LRT construction but awaits final approval from MRT Corp and MOT.
02-07-2025
Rapid Bus Adds Seven New Klang Valley Routes
Rapid KL adds seven new Klang Valley routes to improve links between On-Demand services and major rail networks.
29-04-2025
Penang LRT Project Progressing Steadily - MRT Corp
Construction of the Mutiara Line Penang LRT project is on track, according to MRT Corp.
21-04-2025
Prasarana Targets One Million KM, One Disruption Reliability Rate By 2026
Prasarana targets just one disruption per million KM reliability rate by 2026 on the onset of increased ridership and revenue.
17-01-2025
Latest News
Women Want Female E-Hailing Drivers. But Are There Enough Options In Malaysia?
Looking for female e-hailing drivers in Malaysia? Explore women-only rides, service availability, passenger safety and legal transport requirements.
18-11-2026
Malaysia Toll Abolition Explained: RM400 Billion And Highway Concessions
Why could abolishing Malaysia's highway tolls cost RM400 billion? Explore highway concessions, toll payments and alternatives to nationwide toll abolition.
17-11-2026
GWM Malaysia 2026 Year-End Deals: Prices, Warranties And Financing Offers
GWM Malaysia's 2026 year-end deals include the ORA Good Cat from RM94,000, Haval H6 HEV privileges, WEY G9 financing and Tank SUV warranties.
16-11-2026
Honda Sumber Auto Edaran PJ Closes After 25 Years Of Operations
Honda Sumber Auto Edaran PJ has closed after 25 years, with over 27,000 cars sold. Here's what existing Honda customers should know.
16-11-2026
All-New Nissan X-Trail e-POWER x e-4ORCE Makes First Public Appearance In Malaysia
The new Nissan X-Trail e-POWER x e-4ORCE makes its first public road appearance in KL ahead of its Q4 2026 Malaysia launch. Here's what we know.
16-11-2026
Proton Sales 2026: Geely-Based Models Overtake Homegrown Cars
Geely-based Protons lead homegrown models in 2026 registrations. But the e.MAS lineup and Saga sales reveal a more interesting story.
13-11-2026
Johor Highway Upgrades: PLUS And Senai-Desaru May Open Early
Two Johor highway stretches on PLUS and Senai-Desaru may open early in 2027. Here's where they are, proposed dates and what drivers should know.
13-11-2026
Loke Says Some Welcomed His Resignation, Urges JPJ To Maintain Enforcement
Anthony Loke says some cheered his resignation, expecting JPJ's overloaded lorry crackdown to ease. Will enforcement continue without him?
12-11-2026
Show More
trending_flat
Malaysia First Used Car and EV Consignment Platform
This is the best place to sell your car at true market value. Instead of accepting low dealer trade-ins, we handle everything and connect your car directly to genuine buyers for the highest price.

Understanding CariCarzAutomall Consignment Plan


Approved 200-Check Points Inspection

7 Day Money Back Guarantee

One Year Extended Warranty

No Hidden Charge

