MRT Putrajaya Line Phase Two Operational March 2023, Total Line Spans 56.2KM
-full_normal.jpg)
Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) just released a press statement to inform the general public that the construction works for MRT Putrajaya Line Phase Two from Kampung Batu MRT Station to Putrajaya Sentral MRT Station has been completed and is currently in the operational readiness phase.
The 38.7 km-long section of the Phase Two alignment, which consists of 15 elevated stations and 9 underground stations, is expected to be operational in March 2023. The test runs for this route was completed on 18 December 2022.
Once opened, the entire Putrajaya Line will house 36 stations spanning over 56.2 km and served by 49 units of four car train sets capable of carrying up to 1,200 passengers. Passengers would also have the option of hopping on to other existing rail lines at 10 different interchange stations.
The interchange stations are Kwasa Damansara (with Kajang MRT Line), Sungai Buloh (with KTM), Sri Damansara Timur (with KTM), Kampung Batu (with KTM), Titiwangsa (with Ampang & Sri Petaling LRT Lines, KL Monorail), Ampang Park (with Kelana Jaya LRT Line), Tun Razak Exchange (with Kajang MRT Line), Chan Sow Lin (with Ampang & Sri Petaling LRT Lines), Sungai Besi (with Sri Petaling LRT Line) and Putrajaya Sentral (with ERL and KLIA Transit Lines).
-full_normal.jpg)
For the ease of passenger, there will be 5,870 parking bays made available across the 15 stations along the alignment. Having said that, technically the entire Klang Valleys train line still suffers from lack of efficient first and last mile connectivity which would help eliminate the dependence driving to these stations.
Written By
Kumeran Sagathevan
More then half his life spend being obsessed with all thing go-fast, performance and automotive only to find out he's actually Captain Slow behind the wheels...oh well!
JPJ Running Numbers
KUALA LUMPUR
VSA4819
SELANGOR
BSV2920
JOHOR
JH7613J
PULAU PINANG
PSH5424
PERAK
APN2134
PAHANG
CFJ4636
KEDAH
KGJ9130
NEGERI SEMBILAN
NEM6571
KOTA KINABALU
SJV2938
KUCHING
QAB704Q
Last updated 23 Nov, 2026
Fuel Price
Petrol
RON 95
RM 3.97
+1.38
RON 97
RM 4.90
+1.75
RON 100
RM 7.20
+2.20
VPR
RM 8.23
+2.00
Diesel
EURO 5 B10
RM 5.12
+2.08
EURO 5 B7
RM 5.32
+2.08
Last updated 30 Apr, 2026
Related News
"Too early to assess Putrajaya MRT route on peak-hour congestion" - Loke
It is still too early to assess the effectiveness of Putrajaya's MRT service in reducing traffic congestion, says Loke.
07-04-2023
MRT Putrajaya Line Free Ride Ends Tomorrow March 31
MRT Putrajaya Line free ride ends tomorrow on March 31.
30-03-2023
PM Announces Free MRT Putrajaya Line Fares Until End Of March
PM inaugurated the full launch of MRT Putrajaya Line plus announced free fares starting March 16 to 31, 2023.
16-03-2023
MRT Putrajaya Line Phase Two Expected To Lessen Traffic Congestion Heading To KL
MRT Putrajaya Line Phase Two is expected to reduce traffic congestion to the city centre.
13-03-2023
RapidKL Is Upgrading The LRT, MRT & Monorail Audio System
RapidKL is upgrading the LRT, MRT and Monorail audio system in phases prior to the MRT Putrajaya Line Phase 2 opening.
07-03-2023
MRT Putrajaya Line Fully Operational Starting 16 Mar 2023, 3PM
MRT Putrajaya Link (PYL) from Kwasa Damansara right up to Putrajaya Sentral would be fully operational starting 3pm, 16 Mar 2023
05-03-2023
Phase 2 Of The Putrajaya MRT Line 95% Completed - Prasarana
Phase 2 of the Putrajaya MRT Line is more than 95% complete, with a final test scheduled for the end of this month.
24-02-2023
MRT Putrajaya Line Phase Two To Have 4 Interchange & 2 Connecting Stations
There will be 4 new interchange stations and 2 new connection stations added along the MRT Putrajaya Line.
18-02-2023
Latest News
Women Want Female E-Hailing Drivers. But Are There Enough Options In Malaysia?
Looking for female e-hailing drivers in Malaysia? Explore women-only rides, service availability, passenger safety and legal transport requirements.
18-11-2026
Malaysia Toll Abolition Explained: RM400 Billion And Highway Concessions
Why could abolishing Malaysia's highway tolls cost RM400 billion? Explore highway concessions, toll payments and alternatives to nationwide toll abolition.
17-11-2026
GWM Malaysia 2026 Year-End Deals: Prices, Warranties And Financing Offers
GWM Malaysia's 2026 year-end deals include the ORA Good Cat from RM94,000, Haval H6 HEV privileges, WEY G9 financing and Tank SUV warranties.
16-11-2026
Honda Sumber Auto Edaran PJ Closes After 25 Years Of Operations
Honda Sumber Auto Edaran PJ has closed after 25 years, with over 27,000 cars sold. Here's what existing Honda customers should know.
16-11-2026
All-New Nissan X-Trail e-POWER x e-4ORCE Makes First Public Appearance In Malaysia
The new Nissan X-Trail e-POWER x e-4ORCE makes its first public road appearance in KL ahead of its Q4 2026 Malaysia launch. Here's what we know.
16-11-2026
Proton Sales 2026: Geely-Based Models Overtake Homegrown Cars
Geely-based Protons lead homegrown models in 2026 registrations. But the e.MAS lineup and Saga sales reveal a more interesting story.
13-11-2026
Johor Highway Upgrades: PLUS And Senai-Desaru May Open Early
Two Johor highway stretches on PLUS and Senai-Desaru may open early in 2027. Here's where they are, proposed dates and what drivers should know.
13-11-2026
Loke Says Some Welcomed His Resignation, Urges JPJ To Maintain Enforcement
Anthony Loke says some cheered his resignation, expecting JPJ's overloaded lorry crackdown to ease. Will enforcement continue without him?
12-11-2026
Show More
trending_flat
Malaysia First Used Car and EV Consignment Platform
This is the best place to sell your car at true market value. Instead of accepting low dealer trade-ins, we handle everything and connect your car directly to genuine buyers for the highest price.

Understanding CariCarzAutomall Consignment Plan


Approved 200-Check Points Inspection

7 Day Money Back Guarantee

One Year Extended Warranty

No Hidden Charge
